WHA伟华工业区 – 越南义安省
东南经济区
园区主导产业: 汽车、高科技、软件、塑胶、轻金属、纺织/制衣、快消品(FMCG)、电器、物流及其他相关产业
在过去30年,泰国WHA伟华工业园区有限公司在汽车、石化、电子、消费品和其他出口商品的产业集群打造方面起到了举足轻重的作用。今天,随着不断提升产业客户群体数量,泰国WHA伟华工业园区有限公司已进入邻国越南打造特殊产业主题工业区。
总规模
13,125 莱或
(5,190 英亩 2,100 公顷)
Well-developed Land
- Various sizes of developed land plots with standard soil compaction control
- Well-designed infrastructure and utilities including industrial water, storm drainage, wastewater treatment, flood protection and communication systems
- Environmental monitoring and controlling by professional industrial zone operations and management team
Ready Built Factory for Rent
Size from 500 sq.m. – 10,000 sq.m.
- High quality and well-designed layout with various sizes of factory for rent, easy to start up at lower initial cost of investment
- Flexible investment solutions as a growth path to larger buildings or to developed land as business expands
WHA Ready Built Factory Project (Attached), Thailand
WHA Ready Built Factory Project (Detached), Thailand
WHA Industrial Zone 1 – Nghe An Customer Care Service
WHA Industrial Zone 1 – Nghe An provides investment support to investors starting from day one by coordinating with local authorities. WHA Industrial Zone 1 – Nghe An Customer Care Service also acts as the pool of relevant and practical information, which investors may require during their operations in WHA Industrial Zone 1 – Nghe An
基础设施及公共服务设施
道路系统
- 主路双向四车道 67 米宽混凝土道路
- 二级道路双向两车道 30米宽混凝土道路
EVN 提供电力供应
- 双回路 22KV Cua Lo 分电站供应,总供电量65MVA
- EVN提供110千伏输电线
通讯
- 配备信号优良的电话线
- 高速互联网光纤
- 各类无线互联网移动电话套餐
水供应
- 5,000-20,000 立方米/天 (可提升)
- 水供应标准:30立方米/公顷/天
- 水源来自Cam河
废水处理场
换氧湖一级二级处理 (AL) – 构筑人工湿地每天处理废水量 3,200-9,000立方米/天 (可提升)
应急反应
10公里范围(Cua Lo地区)内有两个消防站,办公区消防站正在建设中,将于2019年完工并投入使用
For more information, please visit: www.whavietnam.com
展览展示
距WHA工业园的距离
WHA 伟华工业区 – 越南义安省
距离 | 行驶距离* |
---|---|
To Vissai Deep Seaport** | 11 Km. |
To Cua Lo Deep Seaport** | 11 Km. |
To Cua Lo Beach | 14 Km. |
To Cua Lo Seaport** | 15 Km. |
To Nghe An Airport | 15 Km. |
To DKC Deep Seaport*** | 17 Km. |
To Vinh Railway Station | 17 Km. |
To Vinh City / Airport | 18 Km. |
To Dong Hoi Seaport | 70 Km. |
To Thanh Thuy Border Gate to Laos | 70 Km. |
To Ha Noi | 288 Km. |
To Hai Phong Port | 340 Km. |
To Da Nang | 487 Km. |
To Ho Chi Minh City | 1,198 Km. |
**Using exiting road (DT536) on google map
***Using exiting road (Le Quy Don) on google map